A

AIA CES Credits

AV Office

Abstract Publication

Academic Affairs

Academic Calendar, Columbia University

Academic Calendar, GSAPP

Admissions Office

Advanced Standing Waiver Form

Alumni Board

Alumni Office

Architecture Studio Lottery

Assistantships

Avery Library

Avery Review

Avery Shorts

S

STEM Designation

Satisfactory Academic Progress

Scholarships

Skill Trails

Student Affairs

Student Awards

Student Conduct

Student Council (All Programs)

Student Financial Services

Student Health Services at Columbia

Student Organization Handbook

Student Organizations

Student Services Center

Student Services Online (SSOL)

Student Work Online

Studio Culture Policy

Studio Procedures

Summer Workshops

Support GSAPP

Close
This website uses cookies as well as similar tools and technologies to understand visitors' experiences. By continuing to use this website, you consent to Columbia University's usage of cookies and similar technologies, in accordance with the Columbia University Website Cookie Notice Group 6
Msaad adamo angelachiesa yangyangai summer   angela chiesa

Infrastructure for Indeterminacy

This project examines the Union Carbide Building at 270 Park Avenue, the largest building ever voluntarily demolished, to propose an adaptable alternative for its future. By looking beyond the original office program, we explore the potential for creating a flexible, constantly adaptable space. Our proposal is updating the building’s infrastructure and adding a raised-flexible floor, this facilitates system integration and allows for tenant adaptation without disruption. The tower is divided into three sections, Hub Domestic, Hub Creative and Hub Podium. The upper tower, with its sunlight and views, is optimized for residential use; the podium, with its street engagement, is suited for large-scale events; and the middle section falls in-between. The infrastructure is color-coded according to the boundaries of the electrical, mechanical, and plumbing systems to illustrate where systems could potentially be installed. This way of thinking proposes a new change in the discipline of architecture, to prepare a building for the future and allow future owners to decide the space.